| Highlight | Four Side Construction Machinery Cooler,3MPa Construction Machinery Cooler,2MPa Construction Machinery Cooler |
|---|---|
| Packaging Details | Customized packing |
| Delivery Time | 7–15 working days for stock items; 20–30 working days for customized/OEM orders |
| Payment Terms | T/T, L/C |
| Supply Ability | 10,000 units/year |
| Highlight | 2.0 MPa Construction Machinery Cooler,Horizontal Construction Machinery Cooler,2.0 MPa Construction Machinery Cooler |
|---|---|
| Packaging Details | Customized packing |
| Delivery Time | 7–15 working days for stock items; 20–30 working days for customized/OEM orders |
| Payment Terms | T/T, L/C |
| Supply Ability | 10,000 units/year |
| Highlight | Single Port construction machinery cooler,Vertical construction machinery cooler,Rectangular construction machinery cooler |
|---|---|
| Packaging Details | Customized packing |
| Delivery Time | 7–15 working days for stock items; 20–30 working days for customized/OEM orders |
| Payment Terms | T/T, L/C |
| Supply Ability | 10,000 units/year |
| Raw Material | 1.5–2.5mm Thick High-Strength Cold Rolled Steel Plate |
|---|---|
| Surface Coating | Matte Black Anti-Corrosion Polyester Spraying |
| Matching Fan Diameter | 350–600mm Customizable |
| Vibration Resistance Grade | Meet Off-highway Construction Machinery Vibration Standards |
| Ambient Temperature Range | -42℃ ~ +62℃ |
| Raw Material | 1.8–2.8mm Thick Carbon Steel Plate |
|---|---|
| Surface Treatment | Matte Black Heavy-Duty Anti-Corrosion Spraying |
| Matching Fan Diameter | 450–650mm Customizable |
| Ambient Temperature Range | -45℃ ~ +65℃ |
| Relative Humidity | 10%–98%, Mixed With Mud, Sand And Dust |
| Base Material | 1.2–2.0mm Cold-Rolled Steel Sheet |
|---|---|
| Surface Treatment | Electrostatic Anti-Rust Spray Coating |
| Layout Form | Single Fan / Double Fan Integrated Shroud |
| Applicable Fan Diameter | 200mm–500mm Customizable |
| Working Temperature Range | -20℃ ~ +60℃ |
| Raw Material | 3003 Thickened High Toughness Anti-rust Aluminum Alloy, Pressure-resistant Welded Pipeline |
|---|---|
| Internal Oil Channel Pressure Test | 2.0–3.0 MPa Full Oil Tightness Inspection For Each Finished Cooler |
| Fin Form & Density | Vertical Serrated Turbulence Fin, 20–32 FPI Adjustable |
| Max Continuous Working Temperature | ≤120℃ |
| Ambient Temperature Range | -48℃ ~ +82℃ |
| Material | Aluminum Alloy |
|---|---|
| Air Pressure | 1.6MPa |
| Oil Pressure | 2.0MPa |
| Heat Area | 20-30㎡ |
| Air Flow | 10-35m³/min |
| Internal Oil Pressure | 2.1–3.4 MPa |
|---|---|
| Fin Density | 16–28 FPI |
| Max Working Temperature | ≤124℃ |
| Ambient Temperature Range | -50℃ ~ +86℃ |
| Relative Humidity | 2%–100% |
| Raw Material | 3mm–8mm 3003 Anti-Corrosion Aluminum Plate |
|---|---|
| Rated Working Pressure | 1.5–3.8 MPa (Adjustable) |
| Leak Test Pressure | 1.6 Times Rated Working Pressure |
| Maximum Working Temperature | 190°C |
| Processing Technology | CNC Cutting + Arc Bending + Precision Drilling + Argon Welding |