| Item | Specification |
|---|---|
| Product Model | New Energy Heavy Mining EV Double-Stage Superimposed Black Coated Multi-Flange Vertical Fin Integrated Heat Exchanger |
| Raw Material | 3003 thickened high-pressure anti-impact aluminum alloy + high temperature resistant matte black powder coating, carbon steel anti-rust flange base |
| Pressure Test Standard | Upper channel 1.4–2.5 MPa / Lower channel 1.7–2.9 MPa independent dual-channel tightness inspection |
| Fin Form & Density | Vertical parallel turbulence fin, 24–42 FPI adjustable |
| Max Long-Term Continuous Working Temperature | Battery loop ≤91℃, Fuel cell & hydraulic loop ≤97℃ |
| Production Process | Two-layer fin separate stacking, independent integral vacuum brazing, frame integral welding, overall electrostatic spraying, flange assembly |
| Applicable Medium | Power battery ethylene glycol coolant, fuel cell deionized cooling liquid, electric engineering machinery hydraulic circulating oil |
| Item | Requirement Standard |
|---|---|
| Ambient Temperature Range | -46℃ ~ +77℃ |
| Relative Humidity | 2%–98% open-pit mine, outdoor heavy vehicle charging station environment with heavy mineral dust, mud splash, rainwater soaking and high-frequency continuous low-frequency vibration |
| Installation Position | Vertical overall hoisting fixed installation at front heat dissipation cabin of new energy mining heavy trucks and large electric loaders |
| Working Condition | 24-hour uninterrupted full-load transportation and loading operation, synchronous heat generation of battery, fuel cell, drive motor and hydraulic pump, frequent instantaneous pressure impact |
| Environmental Resistance | Black coating isolates aluminum from corrosive substances, vertical fin gaps will not harden mud blocks, high-pressure water gun flushing is allowed for daily site cleaning |